New Service Procedures
Serviceable Structures
-
All URD service is member installed
-
Service wire and metering installations may be purchased from other electrical merchants as long as they meet NEC specifications.
-
Prices for construction and wire will be recalculated periodically.
The following link will take you to information regarding an Overhead Single Phase Line Extension/New Construction:
Site Built Home - Permanent Residence
The following link will take you to information regarding an Overhead Single Phase Line Extension/New Construction:
Permanent Residence for a Mobile Home
The following link will take you to information regarding an Overhead Single Phase Line Extension/New Construction:
The following link will take you to information regarding an Underground Single Phase Line Extension/New Construction:
-
Meter loop/Meter can
-
4/0 URD service wire $2.50/ft + tax (Cost is for wire only. Installation is customer's responsibility)
-
350 URD service wire $3.75/ft. + tax (Cost is for wire only. Installation is customer's responsibility)
-
Restrictions
-
All service must meet National Electric Code; HOTEC reserves the right to disallow any service not up to NEC or HOTEC specifications.
-
Underground service must be buried a minimum of 24”...
-
HOTEC will extend 125’ ft. of secondary service from transformer. If service has not yet made contact with the home’s electrical entrance there will be a meter pedestal set at this point or any point between the transformer and the 125’ft. secondary extension.
-
If a service extends past 125’ft. the customer will be responsible for installing all secondary wire and conduit past the point of the pedestal.
-
Owner or builder will be responsible for any trenching, bedding, or backfill. All trenching, bedding, and backfill must be approved by HOTEC.